Updated October 2026. A step-by-step renovation plan for a house you plan to sell, from the buy math to the listing, with EPA, HUD, IRS and NAR pages checked on October 28, 2026.
A solid renovation plan for a flip has five parts: the numbers before you buy, a written scope, a schedule, a budget with a 10% to 20% cushion, and an exit plan for the sale. Rules count from day one: in a pre-1978 home, anyone paid to disturb paint must be lead-safe certified, and EPA says about three-quarters of those homes still contain lead paint.
Jump to: 💲 Buy math · 🪜 Scope and permits · 🤝 Crew and schedule · ⏱️ Budget and money · 🏠 Selling the flip · ❓ FAQ
Key takeaways
- About three-quarters of U.S. homes built before 1978 still contain some lead-based paint; paid work that disturbs it needs EPA lead-safe certification.
- Realtors see the most rising demand for kitchen upgrades (48%), new roofing (43%) and bathroom renovations (35%) (NAR 2025).
- Hold a property one year or less and the gain is short-term for tax purposes (IRS Topic 409).
- Plan the sale before the first hammer swings. Every month of delay adds loan interest, taxes, insurance and utilities.
Renovating a house to sell is different from fixing up your own home. Your taste matters less than the buyer’s, and time is money in a very direct way. The plan below is the order we’d follow on a typical single-family flip. It works for a light cosmetic refresh and for a gut job. The bigger the job, the more each step matters.
Step 1: How do you check the numbers before you buy?
Work backward from the sale. Start with the price the finished home is likely to sell for, based on recent sales of updated homes nearby. That’s often called the after-repair value. Then subtract everything it’ll cost to get there.
- Purchase price and buying costs.
- Renovation cost, plus a cushion of 10% to 20% for surprises.
- Holding costs for every month you own it: loan interest, property tax, insurance, utilities.
- Selling costs: listing, closing costs and any buyer-agent compensation you choose to offer.
- Your profit target.
If the math only works when everything goes right, pass. Many investors use a rule of thumb like paying no more than about 70% of the after-repair value minus repairs. It’s a screen, not a law. Your market, your financing and your timeline decide the real number. Our guide to flipping a foreclosure home covers buying at auction or from a bank.
Step 2: How do you write the scope and get permits?
Write down every job, room by room, before you hire anyone. Workers are not designers. They’ll do what you tell them, nothing more and nothing less. A clear scope gets you comparable bids and fewer change orders.
Aim the scope at what buyers pay for. In NAR’s 2025 Remodeling Impact Report, Realtors saw the biggest rise in demand for a kitchen upgrade (48%), new roofing (43%) and a bathroom renovation (35%). On the low-cost end, a new steel front door had an estimated 100% cost recovery. Painting the entire home was the project Realtors most recommended before listing (50%).
Pull permits for structural, electrical, plumbing, roofing and HVAC work. Unpermitted work can come back at inspection or appraisal and stall the sale. Our home renovation checklist helps you list the jobs, and our notes on common renovation mistakes when selling show what to skip.
Step 3: What changes in a home built before 1978?
Lead rules apply. The federal government banned lead-based paint for homes in 1978, and the EPA estimates about three-quarters of U.S. homes built before then still contain some. Sanding, scraping or demolishing painted surfaces can create dangerous dust.
Under EPA’s Renovation, Repair and Painting (RRP) Rule, anyone paid to do work that disturbs paint in pre-1978 housing must be certified in lead-safe work practices. The rule generally doesn’t cover owners working on their own pre-1978 home, but EPA still recommends hiring a certified contractor. If you’re flipping, hire certified crews and keep their certificates in your file. Federal lead disclosure rules also apply when you sell most pre-1978 homes.
Step 4: How do you hire the crew and set a schedule?
Hire for reputation, not price alone. Read reviews, ask for references from recent jobs and check the license and insurance for your state. Get at least three written bids on the same scope. Cheap bids that leave items out cost more later.
Then build the schedule in the order trades need it: demolition, structural, rough plumbing and electrical, inspections, insulation and drywall, cabinets, flooring, paint, fixtures, final clean. Doing some work yourself, like demo, paint or landscaping, can save money if you’re fast and careful. Be honest about your time, though. A month of weekends can cost more in holding costs than a crew would.
Plan the mess. Construction debris gets everywhere. Rent a dumpster or haul as you go with a construction debris trailer, so the site stays safe and workers don’t trip over yesterday’s scraps. Our guide on how to handle waste during a remodel covers disposal rules.
Step 5: How do you build the budget and fund it?
You can only budget once you have a time estimate and bids. With those in hand, you can work out a budget line by line: materials, labor, permits, holding costs, staging and selling. Add the 10% to 20% cushion as its own line, so you see when you’re dipping into it.
Sell smarter
List your home on the MLS from $99
A flat fee instead of a percentage, and $0 to Beycome at closing. You stay in control of your sale.
Sell your home →Buy smarter
Get up to 2% back at closing
On homes listed by other agents, Beycome credits you up to 2% of the price at closing (1% kept, $1,499 minimum; not on FSBO homes or homes listed by Beycome sellers).
Buy a home →Track spending weekly against the plan. Small upgrades add up fast. A nicer tile here and a better faucet there are how a budget slips by thousands. Remember that a bigger project usually means the more money that it will cost, so keep the scope tight.
Short on cash? Then you could take out a loan. Investors often use hard-money or short-term rehab loans; others use a line of credit or personal savings. Compare total cost, not just the rate. HUD’s Limited 203(k) program lets homebuyers and homeowners finance up to $75,000 of repairs into an FHA mortgage, but it’s built for people buying or fixing a home, so check eligibility before planning a flip around it.
Step 6: How are flip profits taxed?
Timing matters. The IRS says that if you hold an asset one year or less, your gain is short-term; more than one year, it’s long-term, which is often taxed at lower rates. Many flips are sold within a year, so plan for short-term treatment. People who flip often may also be treated as running a business. Talk to a tax pro before you buy, not after you sell.
Step 7: How do you sell the finished flip?
Plan the exit at the start. Book the photographer for the week the final clean is done. Stage the living room, primary bedroom and kitchen first, since buyers’ agents rank those as the most important rooms to stage in NAR’s 2025 Profile of Home Staging.
Keep selling costs low so the margin survives. A Beycome flat fee MLS listing puts the home on the MLS for $99 (Basic) or $399 (Enhanced), with $0 due to Beycome at closing, in 17 states and DC. You make listing changes yourself on the website. In Florida and Texas, Beycome Title can close the sale: $99 in Florida (prepaid at checkout) and a $299 settlement fee in Texas and in Michigan, Ohio, Illinois and Indiana.
Thinking bigger next time? Our beginner’s guide to flipping apartment buildings covers multifamily deals.
Renovation plans for flips: questions
How do I make a renovation plan for a flip?
Check the numbers before buying, write a room-by-room scope, get permits, hire licensed crews, set a schedule and budget with a 10% to 20% cushion, and plan the sale from day one.
What renovations add the most value before selling?
NAR’s 2025 report shows rising demand for kitchen upgrades, new roofing and bathrooms, and a 100% estimated cost recovery for a new steel front door.
Do I need a lead-certified contractor?
For paid work that disturbs paint in a home built before 1978, yes. EPA’s RRP Rule requires lead-safe certification.
How much contingency should a renovation budget have?
A cushion of 10% to 20% of the renovation cost is common. Older homes and gut jobs need the higher end.
Are house flipping profits taxed as short-term gains?
If you hold the property one year or less, the IRS treats the gain as short-term. Frequent flippers may be taxed as a business. Ask a tax pro.
Can I use a 203(k) loan to flip a house?
The Limited 203(k) lets homebuyers and homeowners finance up to $75,000 of repairs. It’s built for buying or fixing a home, so check eligibility first.
Lead figures and RRP rules from EPA’s Renovation, Repair and Painting Program page. Demand, cost recovery and recommendations from NAR’s 2025 Remodeling Impact Report release. Staging rooms from NAR’s 2025 Profile of Home Staging release. Holding-period rule from IRS Topic 409. 203(k) limit from HUD. All read October 28, 2026. The 70% figure and the 10% to 20% cushion are rules of thumb, not standards. General information, not legal, tax or investment advice.
Beycome prices as of October 2026. “$0 at closing” means no Beycome fee at closing; other closing costs, taxes, title fees and any buyer-agent compensation you agree to still apply. Sellers can list with Beycome in 17 states and DC. Beycome Title: Florida, Texas, Michigan, Ohio, Illinois and Indiana.
Sources
- EPA, Renovation, Repair and Painting Program, read October 28, 2026.
- NAR, 2025 Remodeling Impact Report release, read October 28, 2026.
- NAR, 2025 Profile of Home Staging release, read October 28, 2026.
- IRS, Topic 409, Capital gains and losses, read October 28, 2026.
- HUD, 203(k) Rehabilitation Mortgage Insurance Program Types, read October 28, 2026.
- Beycome, listing package features, October 2026.
Disclosure & Disclaimer
Beycome provides real estate services through affiliated licensed brokerages and has a commercial interest in the services and business models discussed on this blog. Content reflects Beycome’s perspective and may promote our services; it should not be treated as independent or neutral reporting.
Articles are provided for general informational and educational purposes only, not as financial, tax, legal, or investment advice or a recommendation for your particular situation. Reading this blog does not create a brokerage, advisory, or other professional relationship.
Information, opinions, pricing, service descriptions, and comparisons reflect the sources and information available when an article was published or last updated and may change. Although we aim for accuracy, we do not guarantee that all content is complete, current, or applicable to your circumstances. Laws, market conditions, and service availability vary by location. Examples and estimated savings are illustrative, depend on stated assumptions, and do not guarantee individual results.
Verify relevant information directly and consult qualified professionals before making decisions. Beycome services are subject to applicable agreements, eligibility requirements, and state-specific terms.
