Home Improvements

Kitchen Remodeling in 2026: Steps, Order of Work and What It Costs

Kitchen Remodeling in 2026: Steps, Order of Work and What It Costs

Updated October 2026. The steps, order of work and national costs of a kitchen remodel, using the 2025 Cost vs. Value Report (JLC) and NAR’s 2025 Remodeling Impact Report, read October 29, 2026.

A kitchen remodel runs in eight steps: scope, budget, layout, materials, contractor, permits, construction and final inspection. As of October 2026, the latest national Cost vs. Value figures (2025) put a midrange major kitchen remodel at $82,793 and an upscale one at $164,104, while a minor midrange update costs $28,458. Most of the money and the delays sit in cabinets, counters and trades.

Jump to: 🪜 Scope · 💲 Costs · ⏱️ Step by step · 🏢 Permits and contractors · 🤝 Paying for it · ❓ FAQ

Key takeaways

  • 2025 national costs: minor midrange $28,458; major midrange $82,793; major upscale $164,104 (Cost vs. Value, JLC).
  • A major midrange remodel in that report means a 200-square-foot kitchen with 30 feet of semi-custom cabinets and a 3×5-foot island.
  • Homeowners gave a kitchen upgrade a Joy Score of 10 out of 10 (NAR 2025 Remodeling Impact Report).
  • 54% of remodelers paid with a home equity loan or line of credit, 29% with savings (NAR).

We first wrote this page in 2016 with a simple message: a kitchen can make or break a home. That’s still true. What’s changed is the price. This update walks through a full remodel from first sketch to final inspection. If you’re about to sell and wondering whether it’s worth it, read is a kitchen renovation worth it before selling instead. The math is different.

What counts as a full kitchen remodel?

The Cost vs. Value Report draws a clear line, and it’s a useful one for your own planning.

Minor remodel (midrange). In a dated but working 200-square-foot kitchen, the cabinet boxes stay. New shaker-style doors and drawer fronts go on, with new hardware. The range and fridge are replaced with energy-efficient models. Laminate counters, a midpriced sink and faucet, new resilient flooring and fresh paint finish it.

Major remodel (midrange). The same size kitchen gets a functional new layout. That means 30 linear feet of semi-custom wood cabinets, a 3×5-foot island, laminate counters and a stainless double sink. It also gets an energy-efficient range, vented hood, built-in microwave, dishwasher, disposal and custom lighting, plus new flooring and paint.

The upscale version adds premium cabinets, stone counters and high-end appliances. If your plan moves the sink, removes a wall or changes the room’s footprint, you’re in major remodel territory, whatever the finishes.

How much does a kitchen remodel cost in 2026?

The most recent national averages are from the 2025 Cost vs. Value Report, published by the Journal of Light Construction. They cover 119 U.S. markets.

Project (2025 national average) Job cost Resale value Cost recouped
Minor kitchen remodel, midrange $28,458 $32,141 113%
Major kitchen remodel, midrange $82,793 $42,130 51%
Major kitchen remodel, upscale $164,104 $58,561 36%

Your local price can be much higher or lower. Labor rates, permit fees and the age of the house all move it. Old homes often hide surprises behind the walls, like outdated wiring or a drain that won’t pass inspection once it’s exposed. Hold back 10% to 20% of the budget for those, as a planning cushion, and don’t spend it on upgrades until the walls are closed.

Most of the budget goes into a few lines: cabinets, counters, appliances and the trades (plumbing, electrical, drywall). Flooring, lighting, paint and hardware are smaller lines, but they add up. Our guide to choosing kitchen materials breaks down how to split a materials budget.

What are the steps of a kitchen remodel?

1. Write down what’s wrong. Not enough counter? Bad light? A fridge that blocks the doorway? This list keeps the project honest. Collect photos of kitchens you like too; galleries like this one of kitchen inspiration help you show a designer what you mean.

2. Set a budget and a ceiling. Pick the number you’d be happy with and the number you won’t pass. Then decide which items can drop if quotes come in high.

3. Plan the layout. This is where function is won or lost. Start with the work triangle and aisle widths in our six kitchen layout rules. Moving plumbing and gas costs more than moving cabinets.

4. Choose materials and appliances. Pick appliances before cabinets are ordered, since cabinet sizes depend on them. Lead times on cabinets and some appliances can run for weeks, so order early.

5. Hire and sign. Get at least three written bids for the same scope. Compare what’s included, not just the total.

6. Demolition and rough-in. Old cabinets come out. Plumbers and electricians move or add lines. The building inspector checks this work before walls close.

Sell smarter

List your home on the MLS from $99

A flat fee instead of a percentage, and $0 to Beycome at closing. You stay in control of your sale.

Sell your home →

Buy smarter

Get up to 2% back at closing

On homes listed by other agents, Beycome credits you up to 2% of the price at closing (1% kept, $1,499 minimum; not on FSBO homes or homes listed by Beycome sellers).

Buy a home →

7. Walls, cabinets, counters. Drywall and paint, then flooring (depending on the type), then cabinets. Stone counters are measured after the cabinets are in, then cut and installed. Backsplash goes on after counters.

8. Appliances, lights, final inspection. Hook-ups, fixtures, a punch list of small fixes and the final permit sign-off.

Plan how you’ll eat while the kitchen is out. A folding table, a microwave, a kettle and a plug-in cooktop in another room make weeks without a kitchen a lot easier. Clearing clutter first helps; these steps to free up space at home are a good warm-up.

Do you need a permit and a licensed contractor?

Usually, yes, for anything beyond cosmetic work. Most cities and counties require permits for new electrical circuits, plumbing changes, gas lines, structural changes and often for new windows or vents. Rules vary, so call your local building department or check its website before work starts.

Permits protect you later too. When you sell, buyers, appraisers and lenders may ask about unpermitted work. A finished permit file is easy proof the job was done right.

When you compare contractors, check the state license, ask for proof of insurance, read the payment schedule and make sure the contract lists the scope, materials, timeline and who pulls the permits. Avoid paying most of the price upfront. Our guide on planning a successful house remodel has a contractor checklist, and our house remodeling guide covers larger projects. Adding an outdoor cooking area too? See what to plan for an outdoor kitchen.

How do people pay for a kitchen remodel?

NAR’s 2025 Remodeling Impact Report asked. Most consumers relied on home equity loans or lines of credit (54%), then savings (29%) and credit cards (10%). Only 9% said housing affordability was a reason they remodeled.

The same report found homeowners rated a kitchen upgrade 10 out of 10 on its Joy Score. A kitchen upgrade also led the projects where Realtors saw demand rise, at 48%. People love their new kitchens. Whether they get the money back is a separate question, and the Cost vs. Value numbers above show a major remodel recovered about half its cost at resale in 2025.

So remodel for yourself if you plan to stay. If you might sell within a few years, read should you remodel if you plan to sell before you sign. And when the time comes, list with Beycome on the major home search sites and the MLS from $99, with $0 due to Beycome at closing.

Kitchen remodeling questions

How much does a kitchen remodel cost in 2026?

The latest national averages (2025 Cost vs. Value) are $28,458 for a minor midrange remodel, $82,793 for a major midrange one and $164,104 for upscale. Local costs vary.

What is the difference between a minor and a major kitchen remodel?

A minor remodel keeps the cabinet boxes and layout and updates fronts, counters, appliances, floors and paint. A major remodel brings a new layout, new cabinets and an island.

What is the order of a kitchen remodel?

Plan, budget, design the layout, pick materials, hire, demolish, rough-in plumbing and electrical, inspect, close walls, install cabinets, then counters, backsplash, appliances and final inspection.

Do I need a permit to remodel my kitchen?

Usually for electrical, plumbing, gas or structural changes. Cosmetic work often doesn’t need one. Check with your local building department.

How do most people finance a kitchen remodel?

NAR’s 2025 report found 54% used home equity loans or lines of credit, 29% used savings and 10% used credit cards.

Does a kitchen remodel pay for itself?

Rarely in full. In 2025 a major midrange remodel recouped 51% at resale and a minor midrange update recouped 113%, nationally.

Cost figures are 2025 national averages from the Cost vs. Value Report (Journal of Light Construction), the latest available as of October 29, 2026; resale values are estimates, not appraisals. Financing and Joy Score figures from NAR’s 2025 Remodeling Impact Report press release. The 10% to 20% contingency is a planning suggestion, not a published figure. Permit rules vary by city and county. Beycome Basic is $99 as of October 2026; “$0 at closing” means no Beycome fee at closing. General information, not contractor, legal or financial advice.

Disclosure & Disclaimer

Beycome provides real estate services through affiliated licensed brokerages and has a commercial interest in the services and business models discussed on this blog. Content reflects Beycome’s perspective and may promote our services; it should not be treated as independent or neutral reporting.

Articles are provided for general informational and educational purposes only, not as financial, tax, legal, or investment advice or a recommendation for your particular situation. Reading this blog does not create a brokerage, advisory, or other professional relationship.

Information, opinions, pricing, service descriptions, and comparisons reflect the sources and information available when an article was published or last updated and may change. Although we aim for accuracy, we do not guarantee that all content is complete, current, or applicable to your circumstances. Laws, market conditions, and service availability vary by location. Examples and estimated savings are illustrative, depend on stated assumptions, and do not guarantee individual results.

Verify relevant information directly and consult qualified professionals before making decisions. Beycome services are subject to applicable agreements, eligibility requirements, and state-specific terms.

Artur

Artur

Artur is Beycome’s too-smart real estate guru. It learns from the real transaction data behind Beycome listings — list prices, sold prices, days on market, commissions, fees, and local market rules across the states and jurisdictions where Beycome operates — then turns that data into practical guides, comparisons, and market insights built to help people make smarter real estate decisions.

How much can you save selling and buying with Beycome?

If you sell a $400,000 home, you save up to $20,000 compared to a traditional way. And if you buy your next place with us, you also get up to 2% back at closing. Seriously.